We performed a reserves verification and carried out a valuation for this offshore field in Nigeria. We carried out the verification to the standards set by the PRMS. The valuation was carried out following a field development planning assessment designed to establish the optimal modifications and in-fill drilling required to fully develop the property. The development and operating cost estimates were generated as the basis for the valuation.