We carried out a screening study for an exploration license in the Central Graben of the UKCS. A range of potential oil field prospects were evaluated ranging from 25 through to 100 million barrels recoverable. The study’s key objective was to establish if economic solutions could be established for development of these relative small prospective field sizes using Floating Production Technology. The development and operating cost estimates were generated using our NETCO$TER Cost Evaluation Software.