Implemented a Pre-FEED study to establish the optimum production configuration to develop this field, a gas development in 2,850m of water. When developed it will be the deepest producing gas field in the world.
The work was implemented in stages:
All aspects of the design were covered during the assessment including: Drilling; Subsea, Umbilicals, Risers and Flowlines (SURF); Pipelines; Floating Production Vessels; Topsides Facilities and Onshore Facilities.
Key aspects of the work were to: