We carried out a screening study for a relatively large onshore non-associated gas field in Bangladesh with reserves of 1.0 Trillion Cubic Feet. A key element of the study was to assess the optimum method for production of this field which had a significant level of associated liquids: depletion, recycling and depletion with compression. The development and operating cost estimates were generated using our NETCO$TER Cost Evaluation Software.